Category: Design
2.7-1 Offshore Workshop
The 2.7-1 offshore workshop is designed to use on oil rig for drilling equipment installation and maintenance. This workshop is converted from 20ft shipping container and comply with DNVGL-ST-E271 standard.…
Read more > >BOP Lifting Frame Design
BOP (Blowout Preventer) lifting frame is one of the lifting appliances used to shift BOP stacks by chain hoist on the rig. Sometimes, drill operator modified the BOP lifting frame…
Read more > >